
Energy & Utilities
Network operators, utilities and power producers funding record investment without losing the public.
Client engagements since 2022
Network and generation investment plans reviewed since 2023
Average fall in maintenance cost per asset on our programs
We work with electricity and gas networks, water companies, integrated utilities and power producers on investment plans, asset strategy, regulation and the economics of new generation.
Energy companies face an unusual mix of pressures: more capital to deploy than ever before, regulators and politicians watching every bill, and demand forecasts that change faster than a ten-year plan can absorb. Getting the order of investment right, and running existing assets longer and more cheaply, has become the core management problem.
We work with transmission and distribution operators, water utilities, integrated utilities and independent power producers in Europe, North America, Japan and Australia. Typical work includes testing and prioritizing capital plans ahead of regulatory submissions, shifting maintenance to condition- and risk-based regimes, building the data tools that support those decisions, and advising boards on generation portfolios and acquisitions as the mix of supply changes.
Connection queues are holding back new supply
Wind, solar and storage projects can wait five years or more for a grid connection, and network operators are under pressure to clear the backlog without overbuilding.
Investment is outpacing regulatory allowances
Many network operators need to spend two to three times their historical capital, while regulators push back on every dollar that lands on customer bills.
Maintenance is moving from calendars to condition
Fixed-interval maintenance is too costly for an aging asset base, and running equipment to failure is not acceptable. Sensor data and risk models are filling the gap.
Data centers are reshaping demand forecasts
Large new loads from data centers and electrified industry are arriving faster than planning cycles were built to handle.
Executive Officer, International Business, a listed electric utility in Japan
The sector team
Partners who have run businesses in the sector and now advise them.
Directors' briefing: overseeing AI without becoming the AI committee
board-ai-oversight-briefing
Event
Trevor Ofori and Patrick Hofer
A morning briefing in Zurich, also streamed online, for board members on the questions to ask about AI risk, regulation and return, and how to fit them into the board's calendar.
Software Pricing 2026: the move from seats to usage
software-pricing-2026
Report
Divya Raghavan and Darren Koh
A survey of 318 B2B software companies on how AI features are changing what they charge for, how customers respond, and which pricing models are holding up.
Separating a business cleanly: a roundtable on carve-outs
carve-outs-roundtable
Event
Kamran Sadeghi and Victor Amaral
A small morning session in London for executives preparing to sell or spin off a division, on stranded costs, transition services and keeping both businesses running.
What China-plus-one sourcing really costs consumer brands
china-plus-one-sourcing-costs
Article
Gabriela Quintero and Divya Raghavan
Moving production to a second country lowers tariff exposure but adds cost in places most business cases miss. Here is how to size it before committing.
Workforce planning in insurance: plan for skills, not headcount
workforce-planning-in-insurance
Article
Lucy Barlow
Insurers face a retirement wave in underwriting and claims just as automation changes the work. Planning by headcount misses both. Planning by skill family does not.
Private equity returns now have to be earned in operations
private-equity-returns-from-operations
Article
Laura Kemper and Trevor Ofori
With multiples flat and debt expensive, buyout returns depend on improving the companies themselves. Most value creation plans are not built for that.
The grid connection queue is now the real cost of the energy transition
grid-connection-queue
Article
Darren Koh and Kamran Sadeghi
Capital and turbines are no longer the bottleneck for new generation. Waiting years for a connection is, and developers and utilities need to plan around it.
Capital Projects 2026: why large projects overrun and what the best owners do first
capital-projects-2026
Report
Kamran Sadeghi and Patrick Hofer
A study of 212 energy and industrial projects above $250 million, how far they ran over budget and schedule, and the decisions before final investment that made the difference.
Finding hospital capacity without building new beds
hospital-capacity-without-new-beds
Article
Nathalie Phan and Gabriela Quintero
Most hospitals short of beds are short of discharges. Fixing the flow out of the hospital releases more capacity, faster and more cheaply, than a new wing.
Capital allocation when money costs something again
capital-allocation-when-money-costs-something
Article
Victor Amaral and Laura Kemper
A decade of cheap debt let weak investments hide inside strong balance sheets. With hurdle rates back above 9 percent, the capital budget needs a different process.













